72 continuous hours of constant flow rate testing managed end-to-end at a Permian Basin upstream operator site. Bell coordinated crews, third-party vendors, and produced water handling with zero unplanned restarts (December 2025 – March 2026).
Removes 100% of volatiles at sales gas pressures with no vapor recovery compression required
A zero NOx line heater that utilizes a patent pending process involving an efficient catalytic radiant heater
Innovative technology for CO₂ capture, compression, and sequestration
With zero-emissions it separates oil, aggregate, and filler so that the oil can be rejuvenated and used for virgin asphalt quality paving.